Scope of Work:
New football stadium consisting of new
bleachers, press box, and all-weather track;
baseball field, softball field, multi-use
fields, and swimming pool improvements. The
Design firm selected for this project is
Verde Design.
|
Status: Programming with new field configurations are almost complete.
Currently evaluating conceptual estimates to
compare against original budgets.
Targeting construction start of the stadium
late Spring / Summer 09. In addition, the
District has also hired design professionals
for the site topographic and utility
surveys; geotechnical investigations; and
CEQA process, which are all currently
underway.
|
|
Athletic Improvement
Program
October 30, 2008
Verde Design has been developing the standards for the Athletic Improvements and presenting information to the district including, pool standards and artificial turf standards. Verde has also been developing the standards for field lighting and bleachers at all sites. Verde is currently working on the Schematic Design Phase and is currently scheduled to be complete with that phase in November 2008. The District has selected Robert A. Bothman, Inc. as the Lease/Leaseback contractor for the athletic improvements. A Pre-Construction Services agreement has been signed by the District and is currently being processed. Bothman will begin assisting the architect with project review in November 2008. Athletic improvements are scheduled to begin construction in summer 2009 at Chavez, Edison, and Stagg. These projects will be phased at each site due to constraints with other projects; the first phase will be football field and track improvements.
|
Meeting
Minutes Verde
5-21-08.pdf
6-04-08.pdf
Revised Agenda 0604.pdf
6-25-08.pdf
7-23-08.pdf |
|
Edison
Modernization |
|
Scope: Construction of a new two-story
administration/classroom building to replace
classes currently housed in portable
classrooms, construction of new industrial
arts building and a lunch shelter
replacement.
Convert the existing administration wing
into classrooms, renovation of the existing
science labs, renovation of the library,
renovation of the existing performing arts
building and band/music building. In
addition the existing Main Gymnasium
building, pool building, north & south gym
buildings, wrestling room, and girls and
boys lockers room will be renovated. The
student quad area will be redeveloped to
include a raised platform.
Site parking lots will be upgraded and new
staff parking will be added off Charter way
and a new student drop-off and bus loop will
be added. New fencing to improve campus
security is also included.
The Architectural firm selected for this
project is MVE Institutional, Inc.
|
Status:
October 30, 2008
The architect, MVE Institutional, is currently preparing the Programming Document for Measure Q scope of work, as well as a campus Master Plan that will coordinate both Measure Q and Measure C scope of work to ensure proper integration and sequencing. Weekly meetings have included the administrative staff and teachers. A Master Site Schedule is being developed, and the pre-design phase should be complete within the next few months. The District has also selected a Lease/Leaseback contractor, Roebbelen, to perform pre-construction support services for the architect, including estimating and constructability review.
|
Meeting
Minutes MVE
5-21-08.pdf
5-28-08.pdf
6-4-08.pdf
6-11-08.pdf
6-18-08.pdf
7-2-08.pdf
7-9-08.pdf
7-16-08.pdf |
Edison
Exhibits
Exhibit 06-18-08 - Existing admin
bldg-option 1.pdf
Exhibit 06-18-08 - Industrial Arts.pdf
Exhibit 06-18-08 - Industrial Arts-Future
Science.pdf
Exhibit 06-18-08 - New classroom-admin
bldg-lower floor.pdf
Exhibit 06-18-08 - New classroom-admin
bldg-upper floor.pdf
Exhibit 06-18-08 - Site Plan.pdf
Exibit 06-18-08 - Existing admin bldg-option
2.pdf
SUSD_Edison Master Plan Agenda 6-18-08.pdf
Existing admin bldg-072908.pdf
New classroom-admin bldg_enlarged-072908.pdf
New classroom-admin bldg_ground
floor-072908.pdf
New classroom-admin bldg_upper
floor-072908.pdf
Site Plan_07-30-08.pdf
Vocational art bldg-072908.pdf |
It's a great time
to do business with SUSD
SUSD was a gold sponsor of the 2008 State of the City event held Thursday, Feb. 28 at the Port of Stockton. Many business people, as well as current and former educators stopped by our booth to talk about the recent passage of Measure Q. The Community Relations Office provided folders of information to business executives and contractors, who will be enlisted to help us renovate and repair our school sites over the next 15 years. Mayor Ed Chavez, the Yes on Q committee chairman, mentioned Measure QÃs passage as an example of the cityÃs coming together for our youth during his final State of the City speech. Watch the
PowerPoint presentation (5.6 MB pdf) shown to those who stopped by our booth.
Measure Q passes
with 67.75% of the vote!!!
February 5, 2008, was a monumental day in the history of Stockton Unified School District. Measure Q, the $464.5 million construction bond, passed overwhelmingly. The next 10 to 12 years will see major renovations coming to our campuses.
Everyone associated with the Measure Q campaign would like to thank the numerous volunteers, especially those students, who helped make phone calls, place doorhangers and walk precincts. It was a total team effort to get Measure Q passed, and now the work begins to renovate and modernize our many elementary and high school campuses.
Look for opportunities to serve on site level committees that will help us plot out exactly how our district will look for many years to come.
|
Measure Q Bond
Overview
High School Details
Elementary School Details
Edison Proposed Modernization Design
Measure C Citizens Bond
Oversight Committee
Members: Rhonda Finister, Venice
Holladay, Ted Leland, Ron Paoletti, Kathy Piper,
Kitty Ruhstaller, Gene Acevedo, Angel Jimenez
Expenditures (PDF)
|