Franklin Athletics

Scope:
New football stadium consisting of new bleachers, press box, and all-weather track; baseball field, softball field, multi-use fields, and swimming pool. 
The Design firm selected for this project is Verde Design.

Status:
Franklin Athletics is not scheduled to begin 2013; however, an impact analysis is being conducted in order to ensure there are no future conflicts between current work being designed and the athletic improvements.

Athletic Improvement Program

October 30, 2008
Verde Design has been developing the standards for the Athletic Improvements and presenting information to the district including, pool standards and artificial turf standards. Verde has also been developing the standards for field lighting and bleachers at all sites. Verde is currently working on the Schematic Design Phase and is currently scheduled to be complete with that phase in November 2008. The District has selected Robert A. Bothman, Inc. as the Lease/Leaseback contractor for the athletic improvements. A Pre-Construction Services agreement has been signed by the District and is currently being processed. Bothman will begin assisting the architect with project review in November 2008. Athletic improvements are scheduled to begin construction in summer 2009 at Chavez, Edison, and Stagg. These projects will be phased at each site due to constraints with other projects; the first phase will be football field and track improvements.


Meeting Minutes
5-15-08.pdf
6-5-08.pdf
6-16-08.pdf

6-25-08.pdf
7-23-08.pdf
 

Franklin Modernization

Scope:
Construction of a new 2-story administration / classroom building to replace the classes currently housed in portable classrooms.  Modernization of the main building and in the existing gymnasium.  In the main building, the renovation of the theater will include accessibility upgrades, HVAC, electrical, lighting, sound system, seating, finishes and acoustical treatments.  The kitchen will be upgraded too with new food service equipment and the MP/Dining areas will be painted.  The restrooms will be renovated to comply with ADA standards.  A new elevator will be installed to meet current code.  The classrooms will also be renovated with new finishes.

The site will receive a new entry from Fremont Street and on-site parking lot upgrades & expansion as well as new fencing to improve campus security.

Campus infrastructure upgrades will address ADA code compliance, replacement of the main electrical service and upgrades to the electrical distribution, campus-wide data & technology distribution and security upgrades including video surveillance.

The Architectural firm selected for this project is Lionakis Architects.

Status:
The Programming Document and campus Master Plan have been completed by Lionakis Beaumont Design Group. The schematic design phase has also been completed and LBDG will review the Design Development drawings for the Measure C scope of work to ensure project coordination between the two different projects. The new entrance to the site is being designed by Mid Valley Engineering and a meeting is planned with the State and San Joaquin County for approval of the roadway improvements. The project is scheduled to be submitted to DSA in the spring 2009. LBDG is also coordinating with Verde Design on the athletic improvements, they are currently studying what work can be accomplished in the summer 2009, in order to assist the athletic improvement project and reduce the impact to the site during the school year. The District has also selected a Lease/Leaseback contractor, Turner Construction, to perform pre-construction support services for the architect including estimating and constructability review.

Meeting Minutes
Action Plan 9-8-08.pdf
4-17-08.pdf
5-1-08.pdf
5-7-08.pdf
5-15-08.pdf
5-20-08.pdf
5-20--08 REVISED.pdf
5-22-08.pdf
5-29-08.pdf
6-5-08.pdf
8-7-08.pdf
8-14-08.pdf
8-18-08.pdf
8-27-08.pdf
9-2-08.pdf
9-4-08.pdf
9-7-08.pdf
9-18-08.pdf
11-26-08.pdf
Franklin Exhibits
Admin-Classroom Building.pdf
Frankilin Admin-Classroom Bldg 2.pdf
50% SD 080908 main building - first floor.pdf
50% SD 080908 main building - second floor.pdf
50% SD 080908 new building.pdf

 

   Select a project below
 » Chavez  » Stagg
 » Edison  » Walton
 » Franklin  
  Quick Strike
» K8 Play Field and Hard Court Renovations
» Portable Replacements

It's a great time
to do business with SUSD


SUSD was a gold sponsor of the 2008 State of the City event held Thursday, Feb. 28 at the Port of Stockton. Many business people, as well as current and former educators stopped by our booth to talk about the recent passage of Measure Q. The Community Relations Office provided folders of information to business executives and contractors, who will be enlisted to help us renovate and repair our school sites over the next 15 years. Mayor Ed Chavez, the Yes on Q committee chairman, mentioned Measure Q's passage as an example of the city's coming together for our youth during his final State of the City speech. Watch the PowerPoint presentation (5.6 MB pdf) shown to those who stopped by our booth.

Measure Q passes
with 67.75% of the vote!!!


February 5, 2008, was a monumental day in the history of Stockton Unified School District. Measure Q, the $464.5 million construction bond, passed overwhelmingly. The next 10 to 12 years will see major renovations coming to our campuses.

Everyone associated with the Measure Q campaign would like to thank the numerous volunteers, especially those students, who helped make phone calls, place doorhangers and walk precincts. It was a total team effort to get Measure Q passed, and now the work begins to renovate and modernize our many elementary and high school campuses.

Look for opportunities to serve on site level committees that will help us plot out exactly how our district will look for many years to come.

Measure Q Bond Overview

High School Details

Elementary School Details

Franklin Proposed Modernization Design


Measure C Citizens Bond Oversight Committee

Members: Rhonda Finister, Venice Holladay, Ted Leland, Ron Paoletti, Kathy Piper, Kitty Ruhstaller, Gene Acevedo, Angel Jimenez

Expenditures (PDF)

 

© 2008 SUSD   |   SITE MAP  |  STREET DICTIONARY  |  HOME  |  BACK TO TOP