Measure Q Update

Walton

Scope of Work:
Significant Modernizations of classrooms, support areas, motor rooms, playrooms, student toilet/changing rooms in the main building will undergo significant demolition to the interior of the building to allow for reprogramming to better serve the schools needs.  New canopy/covered areas will be added to the main building. 

The existing swimming pool will be renovated to meet ADA requirements for changing areas on pool deck, addition of an accessible lift, and ADA compliance in the restrooms. The renovation scope of this project will include the administration building as well.

The existing Early Intervention Program currently housed in portable classrooms will be replaced with permanent classroom wing.

Site improvements will also include additional parking and fencing.

The Architectural firm selected for this project is MVE Institutional, Inc.

Status:
October 30, 2008
The architect, MVE Institutional is currently working on the Design Development Phase of the project for the first design increment which includes Building A, Building C, and site improvements. The architect is anticipating submitting the design drawings for increment one to DSA in January 2009; they will then begin the design on increment two which will include Building B. The Lease/Leaseback contractor has been selected; Blach Construction will begin working with the architect on pre-construction services beginning in November 2008. The District is planning on mobilizing on the site for construction during the summer 2009. Construction is slated to begin on Building C in late summer 2009.

Meeting Minutes

3-27-08.pdf
4-2-08.pdf
4-9-08.pdf
4-16-08.pdf
4-23-08.pdf
5-7-08.pdf
5-7-08b.pdf
5-14-08.pdf
5-21-08.pdf
5-28-08.pdf
6-4-08.pdf
6-11-08.pdf
6-18-08.pdf
6-25-08.pdf
7-2-08.pdf
7-23-08.pdf
7-30-2008.pdf
8-6-2008.pdf
Preliminary Finish Schedule.pdf
8-13-2008.pdf
8-28-08.pdf
9-10-2008.pdf
9-17-2008.pdf
9-24-2008.pdf 10-30-2008.pdf 11-3-2008.pdf


   Select a project below
 » Chavez  » Stagg
 » Edison  » Walton
 » Franklin  
  Quick Strike
» K8 Play Field and Hard Court Renovations
» Portable Replacements

It's a great time
to do business with SUSD


SUSD was a gold sponsor of the 2008 State of the City event held Thursday, Feb. 28 at the Port of Stockton. Many business people, as well as current and former educators stopped by our booth to talk about the recent passage of Measure Q. The Community Relations Office provided folders of information to business executives and contractors, who will be enlisted to help us renovate and repair our school sites over the next 15 years. Mayor Ed Chavez, the Yes on Q committee chairman, mentioned Measure Qís passage as an example of the city's coming together for our youth during his final State of the City speech. Watch the PowerPoint presentation (5.6 MB pdf) shown to those who stopped by our booth.

Measure Q passes
with 67.75% of the vote!!!


February 5, 2008, was a monumental day in the history of Stockton Unified School District. Measure Q, the $464.5 million construction bond, passed overwhelmingly. The next 10 to 12 years will see major renovations coming to our campuses.

Everyone associated with the Measure Q campaign would like to thank the numerous volunteers, especially those students, who helped make phone calls, place doorhangers and walk precincts. It was a total team effort to get Measure Q passed, and now the work begins to renovate and modernize our many elementary and high school campuses.

Look for opportunities to serve on site level committees that will help us plot out exactly how our district will look for many years to come.

Measure Q Bond Overview

High School Details

Elementary School Details

Walton Proposed Modernization Design


Measure C Citizens Bond Oversight Committee

Members: Rhonda Finister, Venice Holladay, Ted Leland, Ron Paoletti, Kathy Piper, Kitty Ruhstaller, Gene Acevedo, Angel Jimenez

Expenditures (PDF)

 

© 2008 SUSD   |   SITE MAP  |  STREET DICTIONARY  |  HOME  |  BACK TO TOP